The recipe said 190 a batch. The floor counted 117.
Nobody had measured the gap, so the cost per packet that every price was set from was fiction. Here is the system that found it, in forty seconds.
What the system does
Every sack has a lot and a real cost.
Materials arrive on a goods received note, get a lot number and a landed cost, and stock on hand becomes a number the system knows rather than a number somebody counts on a Friday.
Every shift is counted and every loss is named.
A supervisor opens a shift, records the batches mixed and the units counted, and writes a cause against every loss. The shift will not close while the two numbers disagree and nobody has said why.
The floor posts straight into the books.
Dispatch, depot transfers, counter sales, cash-ups and till matching all land in a double entry ledger with VAT and month end. Nobody retypes anything into a spreadsheet at the end of the week.
Why the gap matters
An overstated yield does not sit quietly. Because a shift cannot close until the shortfall is explained, a supervisor has to write off output that never existed, at recipe cost, every single shift. The books then carry a daily loss that never happened. An understated yield hides the real ones. Either way, the cost per unit that every price is built on is wrong, and nobody can say by how much.
One honest note
This was built for batch and recipe production: things that are mixed, baked, filled or packed to a formula. If your plant runs a continuous process, or your accounts live somewhere that has to stay where it is, that is real work to connect and we would scope it before quoting anything.
Check one product this week
Take one product, its recipe, and one week of counted output, and we work out together whether those two numbers agree. Thirty minutes, at your plant or on a call. If they do not agree, you will know by how much before we leave.